Electrical Panel Upgrades & Smart Panels in Austin

For when the calculation says the service genuinely has to grow. Also for when it says it does not, which happens more often than you would expect.

Pricing
Quoted after the load calculation and a look at the cable route
Timeline
Set by the utility, not by us — the disconnect and reconnect are theirs to schedule, and six providers means six processes
Call (737) 330-0611

Sometimes the service genuinely cannot carry another circuit. More often, someone has said it cannot without checking. Both of those situations start with the same short piece of work.

Start with the calculation, because it is frequently the whole answer

A whole-home load calculation adds the fixed loads against the service rating and reports what remains. There are three possible outcomes and they are wildly different jobs:

Headroom exists. Add the circuit. No upgrade, no utility involvement, no scheduling around anybody else. This is the common result in the tract housing built across Cedar Park, Leander, Hutto, Buda and Kyle since the late nineties, where 200-amp services were standard and the panel usually sits conveniently on a garage wall.

Headroom is close. A load-management device lets the charger use capacity that exists but is not simultaneously available — pausing or reducing charging when the air conditioning and the oven are both running. It costs a fraction of a service upgrade and it is the right answer far more often than it gets offered.

The service is genuinely the limit. Then the upgrade is real, and worth doing properly.

We run the calculation before quoting anything in this category. It regularly means telling someone they do not need what they came asking for.

Central Austin is where this is a real conversation

The pre-war and mid-century stock inside the central neighbourhoods — Hyde Park, Travis Heights, Rosedale, Bouldin — was wired for a household with one air conditioner and no electric range. A hundred-amp service was generous at the time. It is not generous against a heat pump, an induction hob and a truck that wants sixty amps overnight.

These jobs also tend to surface adjacent work that the calculation was not looking for: a grounding electrode system that no longer meets the adopted code, a service entrance that has been extended rather than replaced, or surviving cloth-insulated branch circuits behind an otherwise modern panel face. We will tell you what we find and what genuinely has to be dealt with now versus what can wait.

The utility decides the schedule, and there are six of them

This is the part that catches people who have moved from a single-utility metro. A service upgrade requires the supply to be disconnected and reconnected, and that is the utility’s work, not ours.

Austin Energy and Georgetown Utility Systems are municipal. San Marcos runs its own. Pedernales and Bluebonnet are member cooperatives, where you are a member rather than a customer and the process reflects it. Oncor is a delivery utility on the competitive market. They have different requirements, different lead times and different paperwork, and the boundaries follow service territory rather than city limits.

We identify which one serves the meter before quoting a timeline, because a date given without that is fiction.

What the work involves

Panel and breakers matched as a listed combination — never mixed brands sharing a bus, which is a common and genuinely unsafe shortcut. Service entrance conductors sized for the new rating. Grounding brought up to the adopted code, which older properties frequently need. Existing circuits re-terminated and torqued to specification during the transfer, rather than moved across and hoped for.

Permitted and inspected, with utility sign-off before reconnection.

Electrical Panel Upgrades & Smart Panels in Austin — questions

Do I actually need a panel upgrade for an EV charger?

Frequently not. It is the most commonly over-sold item in this trade. A whole-home load calculation is a short piece of work that settles it, and in the post-1995 subdivisions across Williamson and Hays counties it usually reports that the headroom is already there. Where the shortfall is small, a load-management device closes it for a fraction of the cost of a new service.

How long does a service upgrade take?

The electrical work is a day. The schedule belongs to your utility, because the service has to be disconnected and reconnected, and that is theirs to arrange. Six different providers serve the cities we cover and they do not work to a common process or a common timescale, which is why we confirm who serves your meter before quoting a date.

What is a smart panel, and do I need one?

A panel with per-circuit monitoring and remotely controllable breakers. It is genuinely useful if you want visibility of consumption or intend to add solar, storage and a charger over time. It is not a substitute for capacity — if the service is undersized, a smart panel manages the shortage rather than removing it. Buy it for the control, not as a workaround.

What size should I upgrade to?

Two hundred amps covers the large majority of houses with an EV, and often with a second one later. Four hundred is worth considering where there is an ADU on the lot, a workshop, a pool, or a plan for storage and bidirectional charging. The calculation and your intentions decide it — not a rule of thumb about square footage.